Wednesday, December 21, 2011

Tender Submission SSP1


Wah!!! X'mas present??

No...No... Is our submission doc for the tender SSP1...

Duration: 3 weeks

Workforce: Around 7-8 people,

Pages: 7 files with more than 2000 pages,

Weight:  20-30kg

Whooh....  Finally close...


Thursday, December 8, 2011

ISO 9001:2008 Surveillance Audit 2011




Date: 8th December 2011
Venue: UGL Malaysia local
Auditor: Representative from SGS

Thursday, December 1, 2011

Fire Prevention Seminar

A Fire Prevention Seminar was held in UGL local on 2nd December to increase awareness among UGL staff on Fire Safety Knowledge’s. The event was successfully pass the message to all the staff. Thank you again to Fire Prevention Centre.



Thursday, November 17, 2011

Broga Hills


Venue: Broga Hills Semenyih 

Date: 26th November 2011 (Saturday)
Time to gather:  Option I - 5am at UGL office
                         Option II- 6am at Broga Hill

Transport:          Own transport or car pool
Inclusive:            Breakfast provided
Caring tips:         Please bring your sun block, caps, torch light, water etc.


Before the hike to Broga, may be we must know something about it... 


Broga takes its name from the River Broga which runs through the area. The name Broga is believed to be derived from Buragas, a mythical beast that lives in the forest. Contrary to its name appeared, Broga is in fact a quite peaceful location. Sometime it also been referred to Bukit Lalang. 


Broga Hill is not tough to hike and it takes roughly 30 minutes to reach the first lookout point. There are about 3-4 of them, each with slightly different view and the further you go, the higher it is, obviously. Mosquito is a nuisance there, so it’s good to be prepared with insect repellant. Although the hike is short, you may be surprised with the amazing view, which looks as if you are quite high above sea level.